Site preparation
1. Check local requirements
Confirm permitted use, zoning, setbacks and permit requirements with your local authority. Have a qualified professional review structural and foundation needs for your specific unit.
2. Measure the route
Measure road width, turning space, gate clearance and overhead obstacles. Share access restrictions, slope information and photos with our team.
3. Prepare the placement area
Use a stable, level area designed to support the unit. Foundation type and bearing points must suit the selected model, soil conditions and local requirements.
4. Plan unloading and utilities
Confirm unloading equipment and the placement plan. Arrange any electrical, water, wastewater and HVAC connections through appropriately qualified professionals.
5. Confirm before dispatch
Keep access clear and provide a reachable site contact. Discuss unresolved site questions before delivery is scheduled.
Read the shipping policy, or discuss access requirements before delivery.